Highway 15 – Both Directions – Current Planned

Highway 15, in both directions. Tree pruning between 40 Ave and Highway 1A for 6.5 km (Surrey). From 9:00 AM to 3:00 PM PDT daily. Lane Closure. Watch for traffic control. Last updated Fri Jul 12 at 4:41 PM PDT. (DBC-10027)